ESAB: ARC 630i MMA Welding with Long Lead and Arc Gouging – (4610643000)

R39,146.67

Or split into 4x interest-free
payments Learn more
SKU: 4610643000 Category:

Description

Arc 630i is heavy duty IGBT based inverter power
source suitable for MMA welding, Air Carbon Arc
Gouging (A-CAG), Scratch TIG and designed for
24×7 usage.

  • Stable performance with long leads in MMA with
    E6013 and E7018 electrodes
  • Wide operating window: 20 to 630A
  • Wide mains voltage tolerance: 400V -15% … +20%
  • User-friendly controls: adjustable arc force & hot start
    in MMA mode and process selection switch for MMA /
    Scratch TIG
  • In-built protections – mains over/under-voltage & overheating

 

Application Areas

  • Heavy fabrication
  • Construction and erection projects
  • Cement plants
  • Process plants
  • Repair and maintenance

Reviews

There are no reviews yet.

Be the first to review “ESAB: ARC 630i MMA Welding with Long Lead and Arc Gouging – (4610643000)”